COMMERCIAL BUILD ATLANTA PROJECTS

A commercial construction company that specializes in projects from $75,000 to $500,000.

DRIP BAR

A beautiful example of a full CBA project. This location is the benchmark for this franchise. Nothing was spared in this construction only the best and it shows. Please review the photos and if this is the style you would like call. Project cost construction $223,000 total with all equipment $390,000.

PATRIOT DEPOT

15,000 sq ft location. Designed and built by CBA. Total renovation and redesign of operating business. New 20 tons of Hvac. Re designed and equipped shipping facility. Increasing their shipping ability by 4 times. New offices new conference room. 100% redesign. Project time 6 months Cost $450,000.

MEL BELLA

2500 sq ft retail location 100% designed and built by CBA warm environment designed and built for custom designed ladies clothing. Designed and built for under $100,000

PREMIER MARTIAL ARTS

One of America’s top new franchises. This location is the largest in the chain. Lots of fun and easy design.
Cost under $100,000